Maintenance Strategy Flow — Sankey
Flow of AI alerts into Predictive work, PPM windows (Feb/Aug), CBM/RCM, and Corrective actions. Sized from your data.
AI-Powered Failure Prediction — Heatmap
Rows are risk levels; colors match the level. Intensity = count per month.
Low
Medium
High
Critical
Overlap: AI Alerts vs PPM Windows
Bars = AI totals per month. Cyan bars = PPM months (Feb/Aug). Red = AI spikes near a PPM window (±1 month).
6
Dynamic PPM Mapping (AI → Nearest Cycle)
High-volume predictive months mapped to the nearest PPM cycle (Feb or Aug). Point size = alerts. Uses the same threshold.
PPM Timeline — February & August
Time-based PPM windows for 2026 (today marker shown; export via chart toolbar)
Interpretation
- Use the heatmap to plan risk-based interventions between PPM windows.
- Critical/High clusters near Feb/Aug → consider pull-in or scope-up that PPM.
- Low alerts → keep to standard Feb/Aug cadence.
Next scheduled PPM window: February 2027