ATLAS AI & Data-Driven Asset Tracking, Lifecycle & Analytics System Ministry of Health Malaysia

Technical Requirement KPI — TR-KPI Workspace

Back to Dashboard
AI Alerts (2026)
0
Critical
0
High
0
Medium
0
Low
0

Maintenance Strategy Flow — Sankey

Flow of AI alerts into Predictive work, PPM windows (Feb/Aug), CBM/RCM, and Corrective actions. Sized from your data.

AI-Powered Failure Prediction — Heatmap

Rows are risk levels; colors match the level. Intensity = count per month.
Low Medium High Critical

Overlap: AI Alerts vs PPM Windows

Bars = AI totals per month. Cyan bars = PPM months (Feb/Aug). Red = AI spikes near a PPM window (±1 month).
6

Dynamic PPM Mapping (AI → Nearest Cycle)

High-volume predictive months mapped to the nearest PPM cycle (Feb or Aug). Point size = alerts. Uses the same threshold.

PPM Timeline — February & August

Time-based PPM windows for 2026 (today marker shown; export via chart toolbar)

Interpretation

  • Use the heatmap to plan risk-based interventions between PPM windows.
  • Critical/High clusters near Feb/Aug → consider pull-in or scope-up that PPM.
  • Low alerts → keep to standard Feb/Aug cadence.
Next scheduled PPM window: February 2027