Automatic Transfer Switch
Changeover to standby supply: test results, transfer time and contact condition.
Preview (draft-3). The risk level comes from draft rule thresholds, and the machine learning advice comes from models trained on synthetic data only. Results are saved here and do not raise tickets or alerts.
Where each parameter is measured
Generic model, so it will differ from your plant. Each number matches a field in the form below, so hover over either one to find it. Confirm instrument positions against your own plant.
Drag to rotate, scroll to zoom
-
1
Failed transfer tests, last 12 months Count from the transfer test record Healthy: up to 0
-
2
Time to transfer to standby supply Timed at the controller during a transfer test Healthy: up to 10 s
-
3
Days since last transfer test Date of the last transfer test, from the test record Healthy: up to 31 days
-
4
Hot spot rise above ambient Thermal imaging of the terminals, on load Healthy: up to 25 °C
-
5
Contact resistance rise Micro-ohm meter across the contacts, during a shutdown Healthy: up to 25 %
-
6
Load as a share of rating Current meter on the load side Healthy: up to 80 %